Type 1 sub-base calculator

Work out how many tonnes or bulk bags of Type 1 (MOT) you need for a patio, path or driveway sub-base.

Area
Total area
m²
Depth
Compacted depth
mm
Waste factor
Waste allowance
%

How we calculate this

Volume

Area × compacted depth gives the volume of Type 1 once it's been compacted.

Weight

We multiply by 2,100 kg/m³, the typical density of compacted Type 1. That already allows for the stone settling under the compactor, so there's no separate compaction factor.

Ordering

We add your waste allowance for spillage and uneven ground, then round up to whole bulk bags of about 850 kg, or to the next 0.1 t. From about 10 t, a loose tipper load is usually cheaper.

These are estimates for ordering materials, not a structural design. Check site conditions, and anything unusual, with a qualified builder or engineer.

Common questions

How much does a tonne of Type 1 cover?

About 4.8 m² at 100mm deep, or 3.2 m² at 150mm, once compacted.

How deep should Type 1 be?

100mm for patios and paths, 150mm for driveways, and 200mm or more for heavy vehicles or soft ground. Compact it in layers no thicker than about 100mm.

Is MOT Type 1 the same as hardcore?

Not quite. Type 1 is graded crushed stone to a Highways specification, with fines that lock it together when compacted. 'Hardcore' can mean any broken rubble, which doesn't compact as well.

Do I add extra for compaction?

Not if, like this calculator, you use the compacted density (about 2.1 t/m³). The waste allowance then covers spillage and uneven digging. Adding a compaction factor as well would double count.