Block paving calculator

Work out the blocks, Type 1, sharp sand, kiln-dried jointing sand, edging and skip for a block paved driveway or patio.

Project
Total area
m²
Sub-base

150mm recommended for vehicle traffic

Type 1 depth
mm
Bed / laying course

Screeded sharp sand bed, no cement (depth before compaction)

Bed depth
mm
Slabs / Blocks
Width (mm)
Length (mm)
Block thickness (mm)
Laying pattern
Kiln-dried jointing sand also required (~1 bag per 5m²)
Excavation
Ground / soil type
Dig depth: 250mm·Volume: 10.5 m³
Waste factor
Waste allowance
%

How we calculate this

Sub-base

Area × Type 1 depth (150mm by default for vehicles) × 2,100 kg/m³ compacted, plus your waste allowance, rounded up to whole bulk bags.

Laying course

Blocks sit on a screeded sharp sand bed with no cement, usually 30–50mm deep before compaction. Area × depth × 1,600 kg/m³ gives the sand.

Blocks

Each block covers its own size plus a 3mm joint, so a 200 × 100mm block works out at about 48 per m². We add the pattern's cutting waste (herringbone at 45° needs the most cuts) and your general waste, and round up.

Jointing and edges

Kiln-dried sand at about one 25 kg bag per 5 m². Edge restraint runs round the perimeter, held by a concrete haunch of about 0.03 m³ per metre, mixed 1:6 with all-in ballast.

Digging out

The dig covers Type 1 + sand + block thickness. The skip is chosen by the volume of loosened soil and its weight.

These are estimates for ordering materials, not a structural design. Check site conditions, and anything unusual, with a qualified builder or engineer.

Common questions

How deep should a block paving sub-base be?

150mm of compacted Type 1 for a domestic driveway. 100mm is usually enough for a patio or path that only takes foot traffic. On soft clay go deeper, or add a geotextile membrane.

How many blocks are there per m²?

About 50 standard 200 × 100mm blocks per m², or 48 once 3mm joints are allowed for. Add 5% for stretcher bond and 10–15% for herringbone.

Why does block paving need edge restraint?

Blocks are held in place by friction with their neighbours. Without a solid edge, either kerbs or a row of blocks set on end in concrete, they slowly spread outwards and the joints open up.

Can I lay block paving on mortar instead of sand?

The main area should go on sharp sand so it can flex and drain. Mortar or concrete is used only under the edge course.

How much kiln-dried sand do I need?

Roughly one 25 kg bag per 5 m² for the first fill. Joints settle over the first few weeks, so keep a bag back to top them up.